 |
Pond Loop
|
Coils of pipe are connected to a common supply and return line through a manifold.
|
|
All connections are heat fused to ensure no leakage and longevity. Cinder blocks are attached to help anchor the loop to the bottom of the pond.
|
|
Supply and return lines are connected to the fully assembled loop system.
|
|
The pond loop is set into the water.
|
|
Empty coils are floated into position in the deepest portion of the pond.
|
|
After supply and return lines are attached to the furnace, the loop is filled with a water solution and the loop assembly sinks to a permanent position at the bottom of the pond.
|
|  |